Posts from January 2020.

In William Lansing v. Doe, 2019 Ore. App. LEXIS 1564, the Court of Appeals of Oregon considered whether the Economic Loss Doctrine (ELD) applied to the plaintiff’s claims based on purportedly faulty construction work in a home. In determining that damage to persons or property is not a purely economic loss in the context of the ELD, the court concluded that the plaintiff could proceed with a negligence claim against a contractor that performed work on the home.Continue Reading

Often times, both contract and tort claims co-exist in a subrogation matter and the line between the two can be blurred. This is especially true in the context of damages resulting from new home construction defect claims. However, states are increasingly attempting to define the scope of when the “gist of the action” is based in contract only. In Tingler v. Graystone, 834 S.E.2d 244 (Va. 2019), the Supreme Court of Virginia defined that scope in terms of new home construction. The court defined the “source of duty rule” by holding that claims of nonfeasance sounding only in contract do not give rise to an independent tort claim. The court also reiterated its application of the economic loss doctrine, stating that, when negligent actions result in damage to property other than the product itself, there can be a viable tort claim.Continue Reading

In subrogation cases where the insured’s damages were caused by a defective product, the fact that the product at issue is or was subject to a recall announced by the Consumer Product Safety Commission (CPSC) may help to establish that the product was defective when it left the manufacturer’s possession and control. On January 14, 2020, the CPSC announced the following recall related to a product that presents a fire hazard:

The Thompson’s Company Recalls Aerosol Waterproofing Wood and Masonry Protectors Due to Fire Hazard.

According to the CPSC, “[t]he contents of the cans ... Continue Reading

In D’Allesandro v. Lennar Hingham Holdings, LLC, C.A. No. 17-cv-12567-IT, 2019 U.S. Dist. LEXIS 185874, the United States District Court for the District of Massachusetts recently discussed a case against a general contractor and its related entities, all of whom were involved in the construction of a multi-phase construction project. The court held that, in this context, completion of the “improvement” – which was the whole project, rather than each individual phase – triggered the six-year statute of repose. The court also held that the plaintiffs’ misrepresentation, breach of fiduciary duty and unfair business practices claims were not claims based on the design and construction of the improvement and, thus, were not subject to the statute of repose.Continue Reading

Recent Posts

Categories

Tags

Authors

Archives

Calendar Event Calendar

Subscribe

Jump to Page

By using this site, you agree to our updated Privacy Policy and our Terms of Use.